|
|
Title: |
Piping Engineer
|
Location: |
US-Texas
|
Work History: |
QUALIFICATION OF DUTIES FOR PIPING ENGINEER:
Good understanding of distribution and progress of work activities particularly pertaining to multi discipline involvement of piping and mechanical system. Knowledge in accomplishment and variation works tracking for piping in relation to design intension of piping assembly, construction schedule and budgetary control.
Responsible for the execution of all piping engineering work, with specific areas of delivery assurance such as resources management to project, team capability and competency, quality (technical and schedule), health and safety.
Assurance of high-quality technical input to proposal and the business development function.
Making an active contribution to the upstream engineering community of practice.
Exposure includes projects involving mechanical equipment/piping design drawings accuracy of all materials needed for pre-fabrication and erection works. Well known to prepare test packages, witness to different types of testing as per procedure, knowledge for pre-commissioning and commissioning works, witness and signed all re-instated pipelines, functional checks, initial start-up, physical positional checking and related works, prepared and keeps all documents records for completed test packages.
PROFESSIONAL SUMMARY:
Having eighteen (18) years of progress experience in (EPC) project as of piping/structural for various projects, such as Management of Oil and Gas Storage Facilities, Oil and Gas Refinery, Petrochemical Plant, Pipeline, Power Plant, Building Services, HVAC and Plumbing System.
Familiar to the code and standards, such as ASME B31.3 (Chemical Plant and Petroleum Refinery Piping), ASME B31.1 (Power Piping), ASME B31.4 (Liquid Transportation System for Hydrocarbons, Liquid Petroleum gas Anhydrous Ammonia and Alcohols), API 5L (Specification for line pipes), ASME Section II (Materials), Section V (Non-destructive Examination), Section IX (Welding Brazing Qualifications), ASTM (American Society for Testing and Materials), AWS (American National Standards for Structural Welding Codes Steel).
Possesses good understanding of functional and systematic approach in equipment / piping erection works such as:
• Comprehension of all types of drawings and diagram particularly involving piping system like P & ID, Isometric, Pipe support, general arrangement equipment piping and others.
• Ensure the correct documentation to be handed over at the completion / delivery of the facilities and initial of them (e.g. as-built, check list, test records, etc.) to signify completion of the works in accordance to the project requirements.
• Knowledge in piping inspection/testing works.
• Knowledge in documentation procedures like site instruction, test packages, change orders, works permit, method of statement, etc.
• Coordinate works with various disciplines.
• Good knowledge and experience in piping class selection, piping specification, involvement in mechanical piping analysis/modeling, development of BOMs and ISOs.
• Good working knowledge and experience with piping and valves design, engineering construction, standards, codes and practices.
• Overall responsibilities for the monitoring of all piping and mechanical completion activities.
WORK HISTORY:
PERIOD COMPANY / PROJECT POSITION / WORK DESCRIPTION
July 17, 2008 Statoil Iran Piping Engineer
To Present South Pars Gas Field Development
Phases 6, 7 & 8 Deck Construction
& Transportation
: To monitor and appraise the prime contractor and sub contractor performance in the implementation and management of contract requirement for piping engineering, as well as overall monitoring of suitability of selected material to be used on topside facilities.
: Monitor contract or and subcontractor performance as the work progress to ensure that sound of engineering skills are applied and that project materials conform to contract specification, industry standards and good engineering practices.
: Material engineering covers, material aspects of engineering for piping, structures, vessel and all the mechanical equipments. This is also includes corrosion, cathodic protection and painting.
: Keep topside manager and engineering manager update on critical discipline issues as well as any issues that may have a cost or schedule impact.
: Review and initiate necessary actions on contractor’s proposed variations to those specified in the contract. Participate in progress monitoring and reporting activities.
October 22, 2005 Technip France Piping Engineer/Piping Supervisor
June 16, 2008 QGX II LNG Onshore Facilities
Prj. P.O.Box No.22483 Ras
Laffan Industrial City, Doha ,
State of Qatar
: Read and study contract documents, scope of work, drawings and specifications pertaining to piping, mechanical, structural and pipe support to ensure full understanding of the work to be done and to raise Technical Queries to resolved conflicts/deviations prior for the job execution.
: Ensure that all project safety, schedule, quality and financial objectives are achieved.
: Timely and accurate reporting of project status and progress.
: Ability to interpret and understand piping specification and a range of engineering drawings.
: Prepare material take-off accordance with specification.
: Manage and control designed and necessary field changes and provide support input to these changes for minimal re-works.
: Production and resolution of engineering queries and site instruction.
: Implement of method statement for the accuracy
of all jobs in the right steps and procedure.
Aug. 28, 2004 Stone & Webster Asia Inc. Piping Engineer/Piping Supervisor
Apr. 30, 2005 BASF-YPC BCC Project
Dachang Distric, Nanjing
Peoples Republic of China
Pingdingshan 210048
: Well knowledge in engineering works, construction for pre-fabrication of pipe spool, pipe support & structural assembly, piping and mechanical installation.
: Check material list to corresponding isometric drawings base on the line class and material specification.
: Initiate, review & evaluate all isometric drawings to assured without any errors & discrepancies before to start of pre-fabrication works.
: Accumulate all required pipe supports to appropriate for prior pre-fabrication, installation & erection works.
: Report daily progress achievements and concerns on work-in-hand.
: Ensures that construction follow the good practices to avoid / eliminate re-works.
: Responsible to verify and approved all cleared punch list item as per standard practice.
: Documentation and updating of isometric drawing as per actual configuration, and as-built master plan drawing and P&ID.
: Conduct hydro testing and pneumatic test, witness for air blowing, steam blowing, water and chemical flushing.
: Perform pre-commissioning and commissioning up to the mechanical completion works.
Oct. 19, 2003 Clough PTY LTD Piping Engineer/Piping Inspector
Aug. 14, 2004 Napa Napa Oil Refinery
Port Moresby
Papua New Guinea
: Responsible the construction and documentation, involving for prefabrication and execution of pipe spool installation.
: Express all good knowledge for fit-up & welding technique to produce good quality and quantity of works to occur the target schedule deadlines.
: I made specific work plan schedule to achieve all jobs on time.
: Report unsafe practices, procedures, and policies to appropriate managers/supervision.
: Review contractor studies and deliverable to ensure consistency with all aspect of the project and maintenance of the project standards.
: Monitor and appraise contractor’s detailed engineering procedure, procurement and construction and activities.
: Determine and corrective action needed to meet project objectives and ensure that taken.
: Supervise, co-ordinate construction activities to verify that work progresses in accordance with schedule & specification.
: Prepared test packages to all complete pipelines, responsible inspection and reporting during welding and hydrostatic testing of process piping.
: Responsible for producing all “As Built” isometric drawing on site for actual configuration.
: Witness on going hydrostatic and pneumatic test and other relevant inspection.
: During my assignment I implemented my ability and good knowledge to complete to do my job.
February 17, 2002 JGC Corporation Piping Engineer
June 24, 2003 Hassi R’mel
Boosting Project
In Algeria
: Review, implement and respect the codes & standard specification of ASME B31.3 (Chemical Plant & Petroleum Refinery Piping).
: Ability to interpret and understand piping specifications and a range of engineering drawing
: Production and resolution of engineering queries and site instruction.
: Generation of detail production schedule manpower forecasts and man-hour estimate.
: Generation and analysis of man-hour expenditure, calculation of progress, calculation of earnings and productivity reporting.
: Proactive role required in coordination within own other areas and other disciplines.
: Monitor work status to determine potential interfaces or schedule problems to aid application of preventive measures.
: During the execution of piping works I considered any suggestion which dealing and to prevent of delaying matters.
: Ensuring that all project safety schedule, quality and financial objectives are achieved.
: Shall enforce / promote company policy approved for the project.
: General quality works and general quality inspection during finishing stage such as punch listing and verify the completion punch list item including painting and insulation up to reinstatement.
May 04, 2000 Fab and Equipment (F&E) Sr. Piping Engineer
Dec. 30, 2001 Upstream & Downstream
Oil and Gas Refinery in
Venezuela
: Check the project specification, codes and standard for pre-fabrication of pipe spool, pipe support and steel structure.
: Organize Engineering office so that documents are available for easy reference. Work closely with superintendent, supervisor, general foreman and foreman regarding the project schedule, duties and responsibilities of work. Compare/review design drawing with piping and instrument diagram (P and ID) for possible discrepancies.
: Perform on site inspection record findings, issue inspection report and non conformance report (NCR). Prepare punch list and verify completion of punch list item. Witness testing of all piping system as per test procedure.
: Supervise piping, Structural & pipe support works to ensure the materials and installation are in accordance with the approved plans and specification base on inspection and test plan procedure. Resolve technical problems that arise during construction progress.
: Supervise and monitor local and foreign contractor on their day today activities. Advice and comment on proper work execution.
: Assist answering contractor technical query during daily progress meeting
August 31, 1999 JGC Corporation Piping Engineer/Piping Supervisor
December 31, 1999 Hassi R’mel Gas
Treatment Plant
Revamping Project
Phase-2 Algeria
: Review and study all construction documents, the isometric drawing, general plan drawing and P & ID, etc. to minimize the construction error. Monitoring & Inspection of pre-fabrication of pipe spools, pipe support & steel structure.
: Personally investigate all field problems during construction works. Resolved technical discrepancies between piping and structural assembly. Prepare field change sheet (FS) execute the approved actual resolution at the Construction site.
: Perform on site inspection and mark up punch list work and verify completion of punch list item. Witness hydrostatic & pneumatic test, water flushing and air/steam blowing.
: Supervise checking piping prefabrication work to the standard procedure and specification installation is in accordance with the approved plans and specification.
: Assist in the preparation of materials procedure and specification of the company project with the design requirements.
March 16, 1998 M.W. Kellogg Algeria, Inc. Piping Engineer
March 17, 1999 Oil Recovery Project in
Algeria
: Review all important documents related to the construction project. Prepare and check isometric drawing with complete details, section, orientation, elevation, and material take-off. Resolve technical problems occur during all stages of construction project.
: Assist for pre-fabrication, installation and erection of pipe spools, beams, girder and columns. Mandatory inspection the valve installation specifically control valve, and safety relief valve to finalize the correct location and direction of valves.
: Coordinate with the design department, client, subcontractor for any interferences and modification required. Dimensional checking of all tie-in spools, verification of all tie-in spool materials, check the general drawing arrangement background as per civil, structural, electrical, instrument and mechanical vessel drawing. Making the necessary comments on the inter discipline, check drawing to satisfy the process requirement of piping as well changes of piping design lay-out bases on the vendor data given the inter discipline drawing complying with the existing standard.
: Perform inspection for lay out and fit up before welding and check the consumable to be used.
Nov. 04, 1995 Kure Engineering Pte. Ltd. Piping Engineer
Sept. 26, 1997 Polyolefin & Jurong Industrial
Island Gas Aeration Separation
Plant – Phase II in Singapore
: Assigned petrochemical of Singapore (PCSI), Ethylene Glycols Singapore (EGS). Review and study the project specification, codes and standard for piping and civil engineering design. Study and prepare general work plan schedule as per the process operation needed. Prepare weekly work plan schedule and daily progress report.
: Assigned also for revamping works, dismantle the existing piping and steel structure, replace and installed new pipeline and structural as per drawing required.
: Responsible for pre-fabrication and erection of pipe spools, pipe support, and steel structure. Prepare report on current project status and co-coordinate in expediting its completion as scheduled.
: Supervised all phases of construction stages with the emphasis in preparing, monitoring, reviewing and evaluating plans and scheduled of the project.
: Review all construction documents (plans, computation shop drawing, etc) for the purpose of coordination and consistency of the requirement and condition.
: Prepare punch list item and verify the completion of all punch list work. Witness hydrostatic and pneumatic test and line cleaning as per project standard procedure. Assist for pre-commissioning and commissioning works.
July 02, 1994 JGC Corporation Piping Engineer/Piping Supervisor
July 04, 1995 Hassi R’mel Gas
Treatment Plant
Revamping Project
Phase-1 Algeria
: Review construction documents, codes and standard for piping assembly and material required as per specification.
: Responsible for pre-fabrication and erection of pipe spools, pipe supports and steel structure.
: Issued field change sheet (FS) for modification to make fit in addition to complete the structures and pipes, components and system the scope of purchase order of contractor. Imposed on the work executing contractor’s adherence work process.
: Prepare and up date daily reports for various programs. Perform necessary inspection for the proper execution of construction works in accordance with the approved plans and specification. Prepared punch list to all erected spools and support and verify the execution all punch list items.
July 29, 1992 JGC Corporation Piping Engineer/Piping Supervisor
Nov. 30, 1993 Catalyptic Reformer
Project of Bureau de
Skikda in Algeria
: Prepare work schedules hauling of raw material, pipes and fitting, pre-fabrication, erection and installation of spools. Area plant in-charge of piping construction and revamping works, supervise and check all list of material (L.O.M) base on the project materials qualifications.
: Planning/scheduling of Hot and Cold tie-in work. Prepare punch list and verify all complete punch list item.
: Assist the preparation of test packages and complete all-important documents.
: Assist pre-commissioning and commissioning works.
March 15, 1988 Euro Mechanical & Piping Engineer
May 15, 1992 Electrical Contractor
Co. Adma Opco
Das Island Liquefied Natural Gas
& Desalination Project
Abu Dhabi (UAE)
: Review construction codes and standard for pre-fabrication / erection of pipe spools. Review / investigate the existing structural, instrument, electrical facilities for possible obstruction for piping instillation.
: Review isometric drawing as per master plan drawing and piping & instrument diagram (P&ID) for possible discrepancies. Prepare detailed field design sketch as it required.
: Ensure that all works is carried out in accordance with project specifications, procedure, method statements and schedule shall report back in any deviation observed.
: Investigate shop fabricator / erector errors of piping assembly and initiate non-conformance reports in accordance with the client non-conformance reports. Assist in checking subcontractor or vendors invoice for work relative item or material required.
: Assist Chief Construction Engineers (CCE) defines the cost of extra work order / prepared detailed scope of work / identify additional and prepared field materials purchase requisition / estimate cost for extra work, monitor and up date daily progress report.
: Assist superintendent, supervisor with engineering matters as required.
: Compile and update detailed estimate and cost of construction materials, equipment and manpower requirements. Piping works schedule for implementation of the contractor. Prepare detailed estimates of structural steel, bolts, piping materials.
: Responsible for preparing and clearing all piping punch list item, performed other related tasks that may be assigned by the immediate supervisor from time to time.
Dec. 28, 1985 Braun Transworld Piping Foreman
Jan. 01, 1988 Corporation Mina Abdula
Refinery in Kuwait
: Review and study the project specification, codes and standards for piping and civil engineering designed.
: Experience in specific construction design tasks requiring a hands-on focus on piping works.
: Prepared daily, weekly and general work plan schedule as per the process operation needed.
: Posses excellent interpersonal skills and a willingness and ability to work as part of team.
: Proven track record of working within project teams.
: Responsible for pre-fabrication and erection of pipe spool, pipe support, and steel structure.
: Assigned also for revamping works, dismantle the existing piping and steel structure replace and installed new pipeline and structural as per drawing required.
: Prepared report on current project status and co-coordinate in existing its completion as scheduled. Prepared punch list, item, work up and verify the completion of al punch list work.
: Witness hydrostatic and pneumatic test and line cleaning as per project standard procedure. Assist for pre commissioning and commissioning works.
|
Skills: |
Proficient in MS Office Applications (Excel, Word, Microsoft Outlook, Power Point, MS Access, IDMS– Integrated Document Management System, Microsoft Project, SPR-Smart Plan Review, and Internet Explorer).
Project Management Skills
Excellent Presentation Skills
Proficient in both oral and written English
|
Education: |
College Graduate
|
Endorsements
|
 |
Rodrigo has received 0 endorsements.
|
Rodrigo has endorsed 0 Members.
|
| |
Rank |
Title |
Location |
Status |
Actions |
|
Public Messages
|
 |
| From |
Date |
Message |
No public messages. |
|
|